About this deal
Use Geo-FixÒ All Weather Jointing Compound within 45 minutes of opening. In temperatures exceeding 25oC, the material must be used within 30 minutes of opening the bag. Always follow the manufacturer’s instructions carefully. Geo Fix is supplied ready to use and does not require any further mixing or addition of other materials. Geo-Fix® is supplied ready to use and DOES NOT require any further mixing or addition of any other materials. Application
Geo-Fix | Bondit Geo-Fix | Bondit
The figures given below are approximate quantities required at 25mm depth per 20kg of Geofix) Joint width It is essential the joint widths are a minimum of 6mm wide with a minimum depth of 25mm. deeper joints can be filled with dry sand or other materials to meet the required minimum depth. Ensure that the paving to be jointed is dry and free from loose dirt, debris, oil, grease, etc. It is essential that joint widths are a minimum of 5mm wide with a minimum depth of 25mm. Deeper joints can be part filled with dry sand or other dry materials, to the required minimum depth.Work the Geo-Fix All Weather Jointing Compound into the joints with a pointing tool. Top up and compact ensuring a fully compacted and topped up the joint. Carefully sweep off any excess with a soft brush ensuring that the material is swept at a 450 angle to the joints.
Geo-Fix Original | Geo-Fix - FatStack Geo-Fix Original | Geo-Fix - FatStack
To ensure a perfect joint, press the Geo Fix Paving Joint Compound into the joints with a pointing tool or compact into joints using a vibrating plate. Top up as necessary. As the company cannot be aware of all the applications and materials the product may be used on, it is the user’s responsibility to determine suitability for use. Product information Ensure that the paving to be jointed is dry and free from loose dirt, oil, debris and grease etc. it is essential the joint widths are a minimum of 5mm wide with a minimum depth of 25mm. deeper joints can be filled with dry sand or other materials to meet the required minimum depth.Any residue left on the surface when cured can be simply cleaned off by sweeping with a stiff brush. Material or residue that has been left exposed for more than 30 minutes should NOT be used, as it will be adversely affected.
Geo-Fix Original Method | Geo-Fix - FatStack Geo-Fix Original Method | Geo-Fix - FatStack
Finish the surface decoratively giving a smooth flat finish with a pointing tool before moving onto the next area to be jointed. Any residue left on the surface when cured can be simply cleaned off by sweeping with a stiff brush. Coverage The jointing should not be cleaned until cured for at least 7 days. When cleaning the distance between any nozzles and the jointing must be at least 10cm.The jointing should not be cleaned by use of high pressure washers until cured for 7 days. The distance between nozzles to jointing must be at least 10cm.